Drilling waste BC
ケーススタディ
Challenge:
Drilling waste in BC in need of solidification at remote mountain top site. Drilling mud produced near slopes estimated at greater than 28⁰ restricting mobility and truck access. Project deadline was constrained by heavy rain prior to mobilization and wildlife migration and fisheries preservation. Thin layers of gravel-like natural soil provided inadequate soil properties for mix-bury-cover site processing.
Solution:
MetaFLO’s technology offered space savings suitable to the site. Additionally, by applying MetaFLO’s patented high shear solidification process, the difficult residual drill waste could be managed for compliant mix-bury-cover. The challenge of managing the drill waste would otherwise have made the whole drilling operation cost prohibitive.
Result:
Project was completed in required timeframe. The expertise of CCI and Talisman crews working with MetaFLO technology produced a solidified material surpassing all regulatory requirements.
オーナー ヴァーレ・カナダ・リミテッド
請負業者: テルヴィータ社
配給会社: ディ・コープ
ヴァーレ社は、カナダのオンタリオ州北部で採掘場を所有・操業している。採掘と精錬活動を通じて、副産物として汚泥が発生する。顧客は、このスラッジをオフサイトの埋立地まで運搬するための効率的な掘削・運搬ソリューションを必要としていた。
2018年9月末~2018年10月中旬
入札の過程で、MetaFLOは汚泥の掘削と輸送に必要な固形分基準を達成するための最適な配合と添加率を提供するために契約した。分析データを用いて、MetaFLOは重量で1.1%の添加率を見積もった(高含水率に基づく)。バケット混合プロセスでの表面接触と効率を高めるため、大型混合ビンを推奨した。この時点ではサンプルは入手できなかった。
Tervita Corporationは、約4,000m3の汚泥を固化するためにMetaFLO試薬を使用した。現場には35m3のビンが2つ設置され、「重い」スラッジと「軽い」スラッジが混在して投入された。実際の処理では、汚泥1m3あたり平均約30ポンドのMetaFLO MF006試薬が投入されたため、当初見積もられた投入量は正確であった。すべての材料はValeのオフサイト埋立地に安全に輸送された。作業は予定通りに完了した。