Challenge

정기 유지보수를 수행하는 캘리포니아 전기 유틸리티는 정기적인 수로 굴착 작업을 수행합니다. 그 결과 생성된 토양 슬러리는 폐기 전에 반드시 테스트를 거쳐야 합니다. 이 액체 폐기물을 운반하고 폐기하는 데는 많은 비용이 듭니다. 이 경우에는 17,000갤런을 처리해야 했습니다.

Solution

MetaFLO’s MF006 solidification reagent quickly and easily accelerates the solidification process eliminating the need for costly vacuum truck transportation and liquid waste treatment. MF006 is added at an extremely low dose, typically less than 1%.

Result

The solidified mud was tested and met all requirements for beneficial reuse as a clean fill. This material was picked up by a nearby business in need of clean fill resulting in the complete elimination of disposal cost offering an ideal solution for mud disposal California.

Cabonne Shire WWT Lagoons

Key Stakeholders:

Owner: Vale Canada Ltd.
Contractor: Tervita Corp.
Distributor: Di-Corp

vale-tervita-di-corp

Challenge

Vale owns and operates a mining site in Northern Ontario, Canada. Through their mining and refining activities they produce a sludge waste by-product. The clients were in need of an efficient excavation and transportation solution to get this sludge to their off-site landfill.

Date

End of September 2018  -  Mid October 2018

Solution

During the bidding process, MetaFLO was engaged to provide an optimal blend and dosage rate to achieve the solids criteria required for excavation and transportation of the sludge. Using analytical data, MetaFLO estimated a dosage rate of 1.1% by weight (based on a high moisture content). Large mixing bins were recommended for increased surface contact and efficiency during the bucket mixing process. No sample was available at this time.

Result

Tervita Corporation utilized MetaFLO reagent to solidify approximately 4,000 m3 of sludge. Two 35m3 bins were staged on site and were loaded with a composite of “heavier” and “lighter” sludges. The originally estimated dosage rate was accurate as actual treatment averaged approximately 30lbs of MetaFLO MF006 reagent per m3 of sludge. All material was safely shipped to Vale’s off-site landfill. The job was completed on time.