Overview of The Customer
Based in San Francisco, California, this major utility is one of the largest combined natural gas and electric energy companies in the United States. This long-standing business has been operating for over a century and has over 23,000 employees providing natural gas and electric services to over 16 million people.
Pain Point
The company had directed that all wet spoils and fluids generated from underground operations and maintenance activities be brought back to their own sites. At these sites, subcontractors were used to manage the vacuum excavated material. The process involved collecting the vac material in large tanks, letting the solids settle out, removing the surface water, and finally adding a dry bulking agent to the residual slurry. These dry bulking agents were inefficient as they can add as much as 200% in waste volume and will release fluids in transportation. With an excessive amount of added material to meet solids criteria for disposal, the utility company was incurring significant costs related to transportation, disposal, and labor.
Decision Process
MetaFLO reached out to the company in 2014 as a prospect with high opportunity for process improvement benefits. The company was looking for a solution that would continue to mitigate the risks of liquid waste disposal while reducing cost and improving efficiency. MetaFLO was the optimal choice considering its fast, efficient, and cost effective process.
Implementation
The company had pre-existing infrastructure to receive hydro-excavated liquid waste at their facilities. The transition to utilizing MetaFLO technology was immediate and seamless. They simply mixed MetaFLO’s reagent into the vac material to get a dry, earthlike solid, ready for transportation and disposal. Taking only three months from initial product introduction through comprehensive pilot trials to full implementation, this was a solution for the company that was easy to carry out with existing infrastructure and resulted in much less waste and reduced total cost.
How it Works
After implementing MetaFLO’s solidification technology, the utility company’s contractor found a disposal application for the treated material that would reduce costs further. Landfills have a need for day-cover, a layer of compressed soil that prevents each day’s deposition of waste from spreading.The treated material was utilized as day-cover at 2 local landfill sites that would accept the treated waste, to address their daily needs at no cost.
成果
By implementing MetaFLO’s process, the utility company was able to achieve a multitude of positive results. With MetaFLO’s fast-acting reagent, they were able to,
- Reduce the time required to meet solids criteria for disposal
- Eliminate the dry, bulking agents required on-site
- Realize a 0.5% wt/wt addition rate of MetaFLO’s reagent to meet solids criteria
- Reduced the total volume of waste transported off site
- Reduce the number of heavy trucks on the road
- Utilize waste material for beneficial reuse
- Lower GHG emissions.
Ultimately, the company significantly simplified their liquid waste disposal process and reduced total costs by almost 30%.

业主 淡水河谷加拿大有限公司
承包商: Tervita 公司
经销商: Di-Corp

淡水河谷公司在加拿大安大略省北部拥有并经营着一个采矿场。通过采矿和精炼活动,他们产生了一种污泥废物副产品。客户需要一个高效的挖掘和运输解决方案,将这些污泥运到场外的垃圾填埋场。
2018 年 9 月底 - 2018 年 10 月中旬
在竞标过程中,MetaFLO 参与提供了最佳的混合料和加料率,以达到污泥挖掘和运输所需的固体标准。MetaFLO 利用分析数据估算出的剂量率为 1.1%(按重量计)(基于高含水量)。建议使用大型搅拌桶,以增加表面接触,提高桶搅拌过程的效率。目前尚未获得样本。
Tervita 公司利用 MetaFLO 试剂固化了约 4,000 立方米的污泥。现场有两个 35 立方米的垃圾箱,装载着 "较重 "和 "较轻 "的污泥。最初估计的用量是准确的,因为实际处理平均每立方米污泥大约需要 30 磅 MetaFLO MF006 试剂。所有材料都被安全地运往淡水河谷的场外垃圾填埋场。工作按时完成。