호주에서 가장 긴 도로 터널, 메타플로 폐기물 운송 솔루션으로 효율성 개선


 

 

급속 고형화 기술은 폐기물 처리를 간소화하여 시드니 노스커넥스 프로젝트의 시간과 비용을 절약합니다.

Location

Sydney, Australia

도전 과제

The NorthConnex Tunnel, Australia’s longest road tunnel project, generated large volumes of mud and slurry during excavation, which needed quick removal to keep construction on schedule. Traditional disposal methods required transporting liquid waste using vacuum trucks over long distances, leading to high costs and logistical challenges. The heavy use of vacuum trucks increased emissions and fuel costs, putting additional strain on the project’s budget and sustainability goals. An on-site solidification solution was essential to minimize transport needs and maintain efficient site operations.

솔루션

MetaFLO introduced its MF003 reagent to treat the liquid waste on-site, transforming mud and slurry into a stackable solid within minutes. This allowed the material to be loaded onto standard tipper trucks instead of vacuum trucks, significantly lowering transportation costs and simplifying logistics. MetaFLO’s solution enabled waste removal to proceed smoothly alongside excavation, keeping tunnel sites clear and optimizing truck availability for continuous work. The MF003 reagent also met environmental standards, making it a compliant and sustainable choice.

Outcome

✓ COST SAVINGS

By eliminating the need for vacuum trucks and minimizing long-distance transport, the project achieved cost savings of approximately $200 per tonne. These savings had a significant positive impact on the project’s overall budget, allowing resources to be reallocated to other critical areas of construction.

✓ PRODUCTIVITY BOOST

Faster waste handling allowed teams to keep excavation areas clear and work continuously without interruptions. The availability of tipper trucks for waste transport ensured efficient removal and maintained the construction pace, reducing the risk of delays and associated costs.

✓ ENVIRONMENTAL COMPLIANCE

The solidified waste met regulatory standards for disposal, enabling safe, environmentally responsible disposal at nearby clean fill sites. By reducing transportation requirements and emissions, the project supported its sustainability commitments and minimized environmental impacts associated with traditional waste handling.