ガス供給アップグレードのためのドリル廃棄物管理

ケーススタディ

チャレンジ

2015年、カナダの大手天然ガス配給会社は、既存の配給システムをアップグレードするために建設作業を行わなければならなかった。地表の道路や自然生息地の撹乱を緩和するため、提案者は水平方向掘削(HDD)技術を利用した。このプロジェクトでは、20本の大口径ボーリング(36″と42″)が計画された。

HDD operations were anticipated to generate 60,000m3 in need of drill waste management. During some portions of the project, there would be five drill sites operating concurrently.

Much of this project took place in an urban centre along a utilities corridor providing limited space for waste solidification operations.

This waste stream is classified as ‘liquid industrial waste’ by Ontario regulations. The cost to transport and dispose of this waste as a liquid is very high. The carbon footprint and safety risk associated with the transportation of this volume of liquid was also very high.

As a result, the project proponent determined the lowest cost, disruption, risk, and carbon footprint could all be achieved with on-site liquid solidification and developed a scope of work with zero liquid waste to be shipped off site.

ソリューション

MetaFLO’s licensee, Allstream Waste Solutions (AWS), was awarded the contract to provide drill waste management on site. AWS mobilized to each job site with multiple pieces of equipment including two MetaFLO LMS 3  mixing units, semi-solid mixer and dozens of open top bins custom designed for managing heavy drill cuttings.

The lighter drill fluids were to be solidified at very low dose rates using the MetaFLO LMS 3 units and MetaFLO’s proprietary reagent MF002. The heavy drill cuttings were to be mixed with a semi-solids mixer or the bins (seen below) with MetaFLO’s MF006 at even lower dosage rates due to the high quantity of solids in that waste stream.

AWS managed all environmental analysis and final disposal of solidified waste. Based on individual, pilot hole analytical results, final disposal sites were chosen by AWS and approved by the project owner. Once solidified, the waste drill fluids met criteria of clean fill and was used in a rehab project further reducing the environmental impact of this project.

結果

It is estimated our client achieved greater than a 30% cost savings in the management of  this waste stream. The compact design of MetaFLO equipment, efficient site operations and large volume, above ground containment capacity provided by AWS meant that no in ground sumps were required and no off site transportation to was necessary. AWS’s equipment and vehicle inventory was able to handle many sites simultaneously. Finally, the MetaFLO system eliminated thousands of truck hours drastically reducing the carbon footprint of the waste management operations.

カボンヌ・シャイアWWTラグーン

主要ステークホルダー

オーナー ヴァーレ・カナダ・リミテッド
請負業者: テルヴィータ社
配給会社: ディ・コープ

ヴァレ・テルヴィータ・ディ・コープ

チャレンジ

ヴァーレ社は、カナダのオンタリオ州北部で採掘場を所有・操業している。採掘と精錬活動を通じて、副産物として汚泥が発生する。顧客は、このスラッジをオフサイトの埋立地まで運搬するための効率的な掘削・運搬ソリューションを必要としていた。

日付

2018年9月末~2018年10月中旬

ソリューション

入札の過程で、MetaFLOは汚泥の掘削と輸送に必要な固形分基準を達成するための最適な配合と添加率を提供するために契約した。分析データを用いて、MetaFLOは重量で1.1%の添加率を見積もった(高含水率に基づく)。バケット混合プロセスでの表面接触と効率を高めるため、大型混合ビンを推奨した。この時点ではサンプルは入手できなかった。

結果

Tervita Corporationは、約4,000m3の汚泥を固化するためにMetaFLO試薬を使用した。現場には35m3のビンが2つ設置され、「重い」スラッジと「軽い」スラッジが混在して投入された。実際の処理では、汚泥1m3あたり平均約30ポンドのMetaFLO MF006試薬が投入されたため、当初見積もられた投入量は正確であった。すべての材料はValeのオフサイト埋立地に安全に輸送された。作業は予定通りに完了した。