Utilities A Hydro Excavation Case Study

Services publics et hydro-excavation

Par MetaFLO | 12 août 2021

The company had directed that all wet spoils and fluids generated from underground operations and maintenance activities be brought back to their own sites. Ultimately, the company significantly simplified their liquid waste disposal process and reduced total costs by almost 30%.

Avant et après le réactif

Dewatering vs Solidification

Par MetaFLO | 14 mars 2018

Les projets de recherche collaborative industrie-université peuvent être extrêmement bénéfiques, en particulier pour les petites et moyennes entreprises (PME), car ils permettent d'accéder non seulement à une expertise intellectuelle, mais surtout à des équipements de laboratoire de pointe et à une main-d'œuvre peu coûteuse (étudiants). De nombreuses voies de financement sont disponibles pour les collaborations industrie-université, ce qui permet aux PME de mieux exploiter leurs ressources et d'en avoir le plus possible pour leur argent.

Buried Infrastructure

Complexities of Addressing Buried Infrastructure

Par MetaFLO | mars 7, 2018

Les projets de recherche collaborative industrie-université peuvent être extrêmement bénéfiques, en particulier pour les petites et moyennes entreprises (PME), car ils permettent d'accéder non seulement à une expertise intellectuelle, mais surtout à des équipements de laboratoire de pointe et à une main-d'œuvre peu coûteuse (étudiants). De nombreuses voies de financement sont disponibles pour les collaborations industrie-université, ce qui permet aux PME de mieux exploiter leurs ressources et d'en avoir le plus possible pour leur argent.

Solidification of Storm Water Pond Sediment

Solidification of Storm Water Pond Sediment

Par MetaFLO | novembre 9, 2015

The naturally occurring sediment in this storm water management pond had exceeded the pond’s designed capacity. The regional conservation authority planned the remediation of this pond to involve the removal of this sediment. The volume of sediment to be removed was very large, thus the cost to transport and dispose of this wet muck would be very costly.

Drill Waste Management for Gas Distribution Upgrade

Drill Waste Management for Gas Distribution Upgrade

Par MetaFLO | octobre 29, 2015

In 2015, a major Canadian natural gas distribution company had to perform construction operations to upgrade its existing distribution system. To mitigate the disturbance of the surface level roads and natural habitats, the proponent utilized horizontal directional drilling (HDD) technology. Twenty large bores (36″ and 42″) were planned for this project.

MetaFLO Technologies

Hydro Excavation Mud – Pipeline Integrity Test

Par MetaFLO | octobre 29, 2015

Pipeline integrity testing often requires hydro excavation to expose a segment of pipe for inspection. The resulting hydro excavation muds are often a regulated, challenging to dispose of and in some cases, contaminated. In 2015, MetaFLO licensee KBL was contracted by a major Canadian pipeline operator in Alberta to provide the solidification and disposal of 200 m3 of this waste.

Landfill Leachate West Virgina

Landfill Leachate West Virgina

Par MetaFLO | août 13, 2015

Pipeline integrity testing often requires hydro excavation to expose a segment of pipe for inspection. The resulting hydro excavation muds are often a regulated, challenging to dispose of and in some cases, contaminated. In 2015, MetaFLO licensee KBL was contracted by a major Canadian pipeline operator in Alberta to provide the solidification and disposal of 200 m3 of this waste.

MetaFLO Technologies

Enbridge Gas Distribution Pipeline Project

Par MetaFLO | août 12, 2015

The Georgian Bay Pipeline Project was necessary to meet growing need for natural gas in that region. The new pipeline was 20 kilometers and 12” diameter. The route for the pipe included 30 road, rail and river crossings which would require horizontal directional drilling (HDD) to complete. Spent HDD fluids and cuttings are a regulated waste in Ontario and very costly to transport and dispose of. An estimated 250,000 gallons (940,000 litres) of spent drill mud would be in need of disposal.

Drilling Waste in Quebec

Drilling Waste in Quebec

Par MetaFLO | août 12, 2015

Driller for major gas distributor requires cost effective solution for disposing of drilling waste in Quebec near Pierre Elliott Trudeau International Airport. The drill site was in an urban setting with high traffic volume. Drill spoils waste was too liquid and would not be accepted by local disposal site.

Mud Disposal California Hydro Excavation

Mud Disposal California – Hydro Excavation

Par MetaFLO | août 12, 2015

A California electrical utility performing regular maintenance performs regular hydroexcavation work. The resulting soil slurry must be tested before disposal. Transport and disposal of this liquid waste is very costly. On this occasion, there were 17,000 gallons to dispose of.