Revolutionizing Waste Management for Toronto’s Crosstown Subway By MetaFLO | March 31, 2026 MetaFLO’s solidification solution slashes transportation costs and meets stringent urban regulatory standards, supporting a sustainable transit infrastructure in one of Canada’s busiest cities. Download the Case Study file Posted in Case Studies and tagged liquid waste, MF006, solidification, TBM, transport, tunneling