MF003 – HDD slurry ready for transport in 30 minutes
HDD mud ready for transport in 30 minutes, eliminating reliance on external soil and weeks of drying
Australia’s Longest Road Tunnel Made Efficient with MetaFLO’s Waste Transport Solution
Rapid solidification technology simplifies waste handling, saving time and costs for Sydney’s NorthConnex project.
HDD Slurry Solidification for Safe Handling and Disposal
In a Horizontal Directional Drilling (HDD) project in São Paulo, Brazil, MetaFLO’s MF003 solidified slurry with free water in up to 30 minutes, enabling safe handling and disposal of the waste.